For the main stream and special schools together with the remodelling and reconfiguration of the existing buildings to provide improved facilities for all the schools. For the first time in the UK, the new buildings will be build out of a revolutionary new product called Nedura which consists of a prefabricated insulation permanent formwork which keys together and is filled with concrete to create a highly efficient thermal structure erected at higher speeds than other traditional "wet" methods.
Client: London Borough of Haringey
Value: $21m
Status: Completed 2012
Block W is the third new block which provides shared main stream and SEN Teaching areas including Arts and Drama facilities.
The existing buildings will be remodelled to provide new sports gym and dance studio to accompany the existing international standard running track together with ancillary accommodation.
To see where it is, click here: